Wednesday 3 October 2012

Idea developement


In the Myer centre i plan on hanging my 'nano pits' from the current ceiling (to be the sub structure of the new apartment buildings of the future scenario) in the existing voids, this is for a number of reasons. The pits will hang here so that the waste from the new parasitic apartments can funnel down into the pits to be processed, disassembled and sorted into constituent components. Another reason for the placement of the pits is that they can act as a spectacle in the new retail interface of the Myer centre. Finally, they will hang in the void so that people can make the connection between the life cycle of the building. This is achieved as the residential component produces the waste to fuel the industrial component that sorts and stores material for the retail front. 


So tracks will run through the voids, this will have robots running on them capturing the disassembled materials and transporting them to their storage level to be kept there until required by the retail. The materials will be transported to the retail front as required to produce the 3D printed customised products for the public.   

No comments:

Post a Comment